That's right, tomorrow, Saturday, April 21st, 2018 I will be switching from Comcast Business (finally!!) to AT&T Fiber and upgrading from a 50 megabit connection to a 1 gigabit connection! The switch should start between 1 and 3 P.M. central daylight savings time. I'm not sure how long the outage will be but I will also have to switch all my domains over to the new IP address as well. There is a possible 24 hour period of downtime.
~CodeJunkie
|